Archive

LOCATION: Mandra, Perfecture of Attica,Greece. CLIENT: ITALGEN S.p.A DESIGN PHASE: Licensing COMMENCEMENT: 2011 COMPLETION: In Progress SHORT DESCRIPTION: Installation of a wind measurement lattice of 65 meters height for the evaluation of the wind potential on site. The process for the submission to RAE was completed....

LOCATION: Petrina, Gythio, Lakonia, Greece CLIENT: Iliergon L.T.D. DESIGN PHASE: Detailed Design COMMENCEMENT: 03/2011 COMPLETION: 06/2011 SHORT DESCRIPTION: Detailed design, including: Energy study, Electrical installations, Grounding and Lightning protection, Security and Monitoring Systems....

LOCATION: Gerakas, Attica CLIENT: National Bank of Greece DESIGN PHASE: Detailed Design COMMENCEMENT: 2016 COMPLETION: 2017 SHORT DESCRIPTION:  The energy services included: Conditional Survey and asset register of existing installations Establishment of Energy baselines, identification of opportunities Analysis of energy consuming activities and equipment Technical report which includes measurements, analytical calculations and dynamic modelling, techno-economical surveys...

LOCATION: 86, Aiolou street – 6, Sofokleous street – 8-10 Sofokleous street, Athens, Greece CLIENT: National Bank of Greece DESIGN PHASE: Detailed Design COMMENCEMENT: 2014 COMPLETION: 2014 SHORT DESCRIPTION:  The energy services included: Conditional Survey and asset register of existing installations Establishment of Energy baselines, identification of opportunities Analysis of energy consuming activities and equipment ...

LOCATION: OLP, Piraeus , Greece CLIENT: Piraeus Port Authority – Ministry of Culture & Tourism DESIGN PHASE: Architectural Competition COMMENCEMENT: 2012 COMPLETION: -  SHORT DESCRIPTION: In cooperation with the architects the whole area design takes into consideration the basic environmental and sustainable principles. This in combination with the new building for the museum would create...

LOCATION: Aerino, Velestino, Magnisia, Greece CLIENT: Unique Properties S.A. DESIGN PHASE: Licensing, Detailed Design COMMENCEMENT: 10/2011 COMPLETION: In Progress SHORT DESCRIPTION: Detailed design, including: Energy study, Electrical and Mechanical Installations, Security and Monitoring Systems....

LOCATION: Kos island, Greece CLIENT: Robinson Club DESIGN PHASE: Detailed Design COMMENCEMENT: 2007 COMPLETION: 2010 SHORT DESCRIPTION: Renovation of the hotel complex consisting of 650 beds, Main building, restaurants, conference center, swimming pools & spa facilities. Total built are: 38.000m2, Total surrounding area: 220.000m2 New technologies with emphasis in sustainable design were implemented and resulted in...

LOCATION: Athens, Greece CLIENT: General Secretariat of Research and Technology DESIGN PHASE: Detailed Design COMMENCEMENT: 2014 COMPLETION: 2014 SHORT DESCRIPTION: Participation in the scheme for Greece-Israel Bilateral R&T Cooperation 2013-2015, Esco smart city energy plan (escocity) –  funded by General Secretariat of Research and Technology. The project is the design, development and implementation of an integrated...

LOCATION: “Hydes Farm”, Little Bardfield Braintree, Essex, England CLIENT: Lightsource Renewable Energy Limited DESIGN PHASE:  Detailed Design COMMENCEMENT: 04/2014 COMPLETION: In Progress SHORT DESCRIPTION: Detailed design, including: Energy study, Electrical installations, Grounding and Lightning protection, Security and Monitoring Systems....