Close

SYGNUS COURT OFFICES

The refurbishment project for Sygnus Court Office Building involves converting the office areas back to an open plan CAT A layout while implementing improvement works to both the interior and exterior of the building. With a net internal area of 2,025 m², the project enhances the overall functionality and aesthetic appeal of the facility. The upgraded mechanical, electrical, and public health services include cooling, heating, ventilation, automatic controls, domestic water supply, above ground drainage, low voltage (LV) distribution, lighting, lighting control systems, small power, fire alarm systems, access control systems, and energy metering.

JEPA was instrumental in the detailed design and implementation of these electromechanical systems, ensuring that all installations met high standards of safety, efficiency and operational effectiveness.

1

Client

A PLUS CONSULTING LTD

2

Location

MAIDENHEAD, UK

3

Sector

OFFICE, MIXED-USE

4

Period

2019

5

Services

DETAILED DESIGN

Related Projects

THE WAVE- KPMG

THE WAVE- KPMG

2023

5 MARTIN LANE OFFICES

5 MARTIN LANE OFFICES

2019

GOLDEN UNION OFFICE BUILDING

GOLDEN UNION OFFICE BUILDING

2018

AGGEMAR SA OFFICE BUILDING

AGGEMAR SA OFFICE BUILDING

2013

ARENA S.A – MARENA S.A

ARENA S.A – MARENA S.A

2007

OLAYAN SHIPPING SA OFFICE BUILDING

OLAYAN SHIPPING SA OFFICE BUILDING

1997

Jepa lines Jepa lines vertical