Close

TRIPOLI INTERNATIONAL AIRPORT

The International Airport at Tripoli, Libya, was designed and completed between 1983 and 1985 for Gibb Petermuller & Partners. The detailed design phase encompassed the electromechanical (E/M) installations necessary for the airport’s operations. This comprehensive design included various systems to ensure functionality and efficiency within the airport infrastructure. The total built area of the facility is 12,000 m². The engineering team responsible for this project , ensured adherence to high technical and operational standards throughout the design process.

1

Client

GIBB PETERMULLER & PARTNERS

2

Location

TRIPOLI, LIBYA

3

Sector

TRANSPORT, INFRASTRUCTURE, INDUSTRY, MANUFACTURE

4

Period

1985

5

Services

DETAILED DESIGN

Related Projects

SENEKA LOGISTICS CENTER

SENEKA LOGISTICS CENTER

2023

THESSALONIKI – EIDOMENI RAILWAY

THESSALONIKI – EIDOMENI RAILWAY

2022

STOP SA FACTORY & OFFICES

STOP SA FACTORY & OFFICES

2019

THESSALONIKI INTERNATIONAL AIRPORT, MACEDONIA

THESSALONIKI INTERNATIONAL AIRPORT, MACEDONIA

2015

FLEXOPACK – FLEXIBLE PACKING FACTORY

FLEXOPACK – FLEXIBLE PACKING FACTORY

2015

CHATZIMICHALIS BOTTLING FACTORY

CHATZIMICHALIS BOTTLING FACTORY

1997

Jepa lines Jepa lines vertical